Frozen storage in Hamburg

Blower Door Test

Place: Hamburg

Project volume:
Blower door test in accordance with DIN EN 13829 and blower door test as per EnEV 2009.
Leak detection in accordance with DIN EN 13829.
Volume calculation according to DIN EN 13829 and DIN 277
alculation of the building envelope in accordance with DIN EN 13829

Building envelope:
14.000 m²

Net volume:
98.000 m³

Applied measuring technology:
Blower Door Multiple Fan

Read more

Frozen storage in Hamburg

Blower Door Test

Place: Hamburg

Project volume:
Blower door test in accordance with DIN EN 13829 and blower door test as per EnEV 2009.
Leak detection in accordance with DIN EN 13829.
Volume calculation according to DIN EN 13829 and DIN 277
alculation of the building envelope in accordance with DIN EN 13829

Building envelope:
14.000 m²

Net volume:
98.000 m³

Applied measuring technology:
Blower Door Multiple Fan